All the Single-host report job tasks are failing with error 'Process exited with an unknown status: pid xxxxx exit xx' when Insights On-Prem is enabled
Issue
-
In Red Hat Satellite 6.18, whether the issue from JIRA SAT-41513 is visible or not, and if visible, even after it is fixed, the newly invoked Single-host report job tasks take a long time to process and ultimately get stuck in a paused state.
-
From
Administer --> Inventory Uploadmenu, if triggering aGenerate and upload reportaction, that triggers a Generate report job task and is affected by the same issue. -
The problem is only visible on Red Hat Satellite 6.18 instances with the Insights On-Prem feature enabled for Red Hat Lightspeed integration.
Environment
- Red Hat Satellite 6.18.0 - 6.18.2
- Red Hat Lightspeed ( Insights On-Prem )
Subscriber exclusive content
A Red Hat subscription provides unlimited access to our knowledgebase, tools, and much more.