Can resource constraints be applied to entire resource groups with pacemaker in RHEL 6 or 7?
Issue
- Can I apply resource-level constraints to entire resource groups in
pacemaker
? - I see that I can apply constraints to resources with
pcs
to control the location or ordering of operations for those resources, but how can I do the same thing for entire groups?
Environment
- Red Hat Enterprise Linux (RHEL) 6 or 7 with the High Availability Add On
pacemaker
- One or more resource groups
Subscriber exclusive content
A Red Hat subscription provides unlimited access to our knowledgebase, tools, and much more.