Run a route from multiple nodes with camel timer in from uri and sqlcomponent as producer,
Issue
Problem statement : When we run this component in two nodes, both nodes are picking the records are the sametime and trying to process.
Is there a configuration available to run this SqlComponent Poller on a different interval or delay it once its picked. (so that delay interval can be configured differently in both nodes).
Environment
- Red Hat Fuse
- 6.3.0
Subscriber exclusive content
A Red Hat subscription provides unlimited access to our knowledgebase, tools, and much more.