Upgrade from OSP 8 to OS9 failed with "UPDATE_FAILED Error: resources[2]: Deployment to server failed: deploy_status_code : Deployment exited with non-zero status code: 1"
Issue
- Upgrade from OSP 8 to OS9 failed with "UPDATE_FAILED Error: resources[2]: Deployment to server failed: deploy_status_code : Deployment exited with non-zero status code: 1"
- The controller shows below logs :
# journalctl|grep -i os-collect-config |grep -i -A6 "failed" |less
Nov 17 18:00:53 controller0.example.com os-collect-config[1051]: nsaction check\n---> Package openvswitch.x86_64 0:2.5.0-15.git20160727.el7ost will be reinstalled\n--> Finished Dependency Resolution\nUpdating openvswitch with nopostun option\n", "deploy_stderr": "mkdir: cannot create directory \u2018OVS_UPGRADE\u2019: File exists\nerror: openvswitch-2.5.0-15.git20160727.el7ost.x86_64: erase failed\n", "deploy_status_code": 2}
Nov 17 18:00:53 controller0.example.com os-collect-config[1051]: Manual upgrade of openvswitch - restart in postun detected
Nov 17 18:00:53 controller0.example.com os-collect-config[1051]: Attempting to downloading latest openvswitch with yumdownloader
Nov 17 18:00:53 controller0.example.com os-collect-config[1051]: ---> Package openvswitch.x86_64 0:2.5.0-15.git20160727.el7ost will be reinstalled
Nov 17 18:00:53 controller0.example.com os-collect-config[1051]: Updating openvswitch with nopostun option
Nov 17 18:00:53 controller0.example.com os-collect-config[1051]: error: openvswitch-2.5.0-15.git20160727.el7ost.x86_64: erase failed
Environment
- Upgrading from Openstack Platform 8 to Openstack Platform 9
Subscriber exclusive content
A Red Hat subscription provides unlimited access to our knowledgebase of over 48,000 articles and solutions.
Welcome! Check out the Getting Started with Red Hat page for quick tours and guides for common tasks.
