Very slow undercloud operation when updating or deploying a mid-sized overcloud
Issue
-
Every time an operation is done when deploying or updating a medium sized overcloud deployment takes a very long time (more than 1-2 hours)
-
Stack deployment might fail with the following error message
ERROR: openstack Heat Stack update failed. Deploying templates in the directory /home/stack/my-overcloud/templates Stack failed with status: MessagingTimeout: resources.Compute: Timed out waiting for a reply to message ID fd85e8616c3841e2bea3181d904081ba
Environment
- Red Hat OpenStack Platform 7.0 (RHOSP)
Subscriber exclusive content
A Red Hat subscription provides unlimited access to our knowledgebase, tools, and much more.