Sync State in hammer product info command does not match with the repository sync task status on Satellite 6 server.
Issue
-
The
hammer product infocommand shows incorrect sync state:# hammer product info --id X ID: X Name: Red Hat Enterprise Linux Server Label: Red_Hat_Enterprise_Linux_Server Description: Sync State: Syncing Complete. Sync Plan ID: GPG: GPG Key ID: GPG Key: Organization: Default_Organization Content:The
Sync Statein the output of the above command is reflected based on the last synced repository. TheSync Stateof the product showsSyncing Completeeven if the earlier repository sync task is not completed or in error state.
Environment
- Red Hat Satellite 6.x
Subscriber exclusive content
A Red Hat subscription provides unlimited access to our knowledgebase, tools, and much more.