High Availability of the Domain Controller in JBoss EAP 6.3+, EAP 7, RH-SSO 7 and JDG 7
Issue
- Domain Controller Discovery and Failover.
- Could you provide me the procedure to switch the domain controller from master to backup when the master domain controller is down?
- What are the procedure to switch domain controller when the master controller failed?
- How to setup the backup
Domain Controller
in JBoss EAP 6.3 ? - What happens with changes in the DC (through CLI or web console), when the "master-main" is down?In this case, will be the changes in the DC persisted in the domain.xml of master-main automatically ?
- DC failover in EAP6.3.
- How to configure Domain Controller failover in EAP 7?
Environment
- Red Hat JBoss Enterprise Application Platform (EAP) Domain Mode
- 6.3 and above
- 7.x
- Red Hat Single Sign-On (RH-SSO)
- 7.x
- Red Hat JBoss Data Grid (JDG) Domain Mode
- 7.x
Subscriber exclusive content
A Red Hat subscription provides unlimited access to our knowledgebase, tools, and much more.