Procedure to add worker nodes to a pre existing MNO and set control plane from schedulable to non schedulable
Updated -
Add workers using ZTP
Note: All the changes in the manifest described below need to be committed to the git repository used by ZTP.
A link to the procedure to perform this task can be found
Subscriber exclusive content
A Red Hat subscription provides unlimited access to our knowledgebase, tools, and much more.