JBoss ON reports EAP 6 reload operation as failure if EAP management interface takes longer than 20 seconds to load
Issue
- reload fails
- JBoss ON fails to reload EAP 6 instance
- JBoss ON reload operation results in error
Environment
- JBoss Operations Network (ON) 3.1.2
- JBoss Enterprise Application Platform (EAP) 6.x
Subscriber exclusive content
A Red Hat subscription provides unlimited access to our knowledgebase, tools, and much more.