Chapter 15. Repeated Planning
15.1. Introduction to Repeated Planning
The world constantly changes. The problem facts used to create a solution, might change before or during the execution of that solution. There are different situations (which can be combined):
- Unforeseen fact changes: For example: an employee assigned to a shift calls in sick, an airplane scheduled to take off has a technical delay, one of the machines or vehicles break down, ... Use backup planning.
- Impossible to assign all entities now: Leave some unassigned. For example: there are 10 shifts at the same time to assign but only 9 employees to handle shifts. Use overconstrained planning.
- Unknown long term future facts: For example: The hospital admissions for the next 2 weeks are reliable, but those for week 3 and 4 are less reliable and for week 5 and beyond are not worth planning yet. Use continuous planning.
- Constantly changing problem facts: Use real-time planning.
Waiting to start planning - to lower the risk of problem facts changing - usually isn't a good way to deal with that. More CPU time means a better planning solution. An incomplete plan is better than no plan.
Luckily, the optimization algorithms support planning a solution that's already (partially) planned, known as repeated planning.

Where did the comment section go?
Red Hat's documentation publication system recently went through an upgrade to enable speedier, more mobile-friendly content. We decided to re-evaluate our commenting platform to ensure that it meets your expectations and serves as an optimal feedback mechanism. During this redesign, we invite your input on providing feedback on Red Hat documentation via the discussion platform.