Chapter 1. Workflow for converting a virtualization cluster to a hyperconverged cluster

  1. Verify that your virtualization hosts use Red Hat Virtualization 4.2 or higher, and meet Red Hat Hyperconverged Infrastructure for Virtualization Support Requirements.
  2. Subscribe to software repositories.
  3. Convert virtualization hosts to hyperconverged hosts.
  4. Create Red Hat Gluster Storage volumes using storage on the converted host.